Tollerton pump tack was constructed after a need for a new cycling facility for the local community. This rural village is set in beautiful countryside and woodland and made the perfect setting to install an organic look-and-feel multi-wheeled pump track for the locals to enjoy.

Pump track construction work included:

Fencing and securing the site.
Installing control measures for pedestrian access, safety signage.
Setting out with client and engineer.
Tree protection and root protection measures.
Marking and setting out.
Site strip and clearance.
Storage of arising material, Importation of material.
Drainage works,
Sub-base works.
Tarmac surfacing.
Concrete works.
Turfing scheme.
Supply and Installation of permanent user signage.

The construction period was four weeks, and the project was completed on time and within budget for Tollerton Parish Council.