C&K Contractors Logo Link

Horsham Pump Track West Sussex

horsham pump track 11

Horsham pump track building

As part of their ongoing building projects, Berkeley Homes in 2020 chose Clark and Kent Contractors to be involved with the use of their community investment levy. In doing this it meant building something much more inclusive and exciting than your normal playground for their new homeowners and local residents.

The pump track at Horsham by Clark and Kent Contractors featured a variety of berms and jumps and the 200-metre-long track is perfect for all children and teenagers, whether they be beginners or experienced riders, and is the first of its kind for Horsham District.

The Horsham pump track is designed to blend in with the green space with grass banks formed at either end to help make the structure more natural and pleasing to the eye.

The added safety measures of Safagrass protection were chosen to be an extra to the track as protection to the fall areas and features of the track for the community from Berkley homes and installed by Clark and Kent Contractors.

The scope of work included several typical designs and construction-related items and methods. These include:

  • User group and community consultation events
  • Drawing package to assist with planning purposes
  • Pre-construction information prior to works commencing
  • Moving through to the construction stage our scope included
  • Fencing and installing control measures for pedestrian access
  • Safety signage and public information notices
  • Setting out with client and engineer
  • Site strip and clearance
  • Importation of material
  • Drainage works
  • Sub-base works
  • Tarmac surfacing works
  • Concrete works
  • Turfing scheme
  • Maintenance contract
  • Further online project promotion

See this video of Harry Schofield in action at the Horsham pump track.

Location: Horsham Pump Track, The Blvd, Horsham, West Sussex, RH12 1FF

horsham pump track 10
horsham pump track 11
hore4
hore6

Clark and Kent Contractors' multi-wheeled facilities are not only proven to promote the mental health and social benefits of exercise but the organic look and feel of their products, including the unrivalled fitment into the landscape, has won over all generations locally as their professional approach to our facilities was present from start to finish.
Berkeley homes MD Terry George

Other Clark & Kent pump track projects in the Sussex area

Battle, Eastbourne, Newhaven.

© 2024 – Clark & Kent Contractors